Prevention is Better than Cure

Many of us wouldn’t go to see a doctor until we get sick. This not only costs more money, but also causes more pain. Preventive medical assessments may be seemingly unnecessary and unpleasant, but it can help identify potential health problems, save lives, and reduce medical costs.

We often hear of some famous physical doctors or medical experts, who have remedied illness, when troubles surfaced. As a matter of fact, we are all doctors ourselves, in a sense that we take care of our daily lives, command our bodies to certain tasks, and avoid certain activities. We, as doctors ourselves, play a big role every day in maintaining our health. We are all CEOs of our own way of life and happiness. If we do our best to keep up good habits, take care of our bodies regularly, we will save ourselves lots of trouble and money in medical expenses.

Prevention can be beneficial to drilling engineering as well. Our experiences gained and lessons learned help us make right decisions for our next well. Drilling engineering software also serves as a great tool to identify any potential problems in our existing drilling plan or make sound engineering designs.

Take an example of cementing job design. One of the key elements of a successful cementing job is good displacement efficiency (less mud channeling). We have known that several parameters such as casing standoff, flow rate, differentials of fluid properties and hole deviation affect the effectiveness of fluid displacement. Now, with the help of computer modeling, we can see the impacts of these parameters. The following picture shows the mud concentration in the annulus at the end of the cementing job, where casing standoff is 0% throughout the wellbore (casting touches the borehole).

Displacement Efficiency for Casing Standoff 0% - Pegasus Vertex, Inc.

Displacement Efficiency for Casing Standoff 0%

You can see that there are quite large red areas in track 3, indicating poor displacement efficiency.

Now, we change the casing standoff to 70% and keep the other parameters the same. The following picture shows the much improved mud concentration after displacement:

Displacement Efficiency for Casing Standoff 70% - Pegasus Vertex, Inc.

Displacement Efficiency for Casing Standoff 70%

Time and money (not to mention headaches) could be saved if drilling engineers undergo through all the engineering assessments before problems arise. Be sure to use your know-how, skills, experiences, lessons and available drilling software. Having a complete understanding of what will happen gives you a greater sense of control, reduces risks and saves money.

The Toughest Event on the Planet

I was very nervous when I signed up for the Tough Mudder race, especially for the electrodes and the ice baths, but I was ready for a new challenge and it turned out to be a lot of fun. In April 2012 a friend came up to me and asked me if I wanted to join his team for the Tough Mudder race, which is a 12 mile assault course that involves many obstacles and a lot of mud. I was a little hesitant at first because I didn’t want to commit to something so challenging but I succumbed to peer pressure too easily and I signed up.

I must admit the training was hardcore. It was a 5 hour nonstop workout, three times a week for 3 months, but not the regular workout most people are used to or know about. A regular workout consists of cardio, stretch and weights and the dirtiest you can get is with your own sweat, but the training for Tough Mudder goes far beyond that. The “cardio” is 5 hours long consisting of running, swimming and jumping. The “stretch”, well that one can be a regular stretch that one does before a normal workout, but the “weights” consists of lifting heavy logs while running and swimming, climbing high walls, cliff-hanging, and most of the time carrying one of your teammates because they are too weak to continue and all this while being all covered in mud from head to toe. I will admit that I found the training extremely challenging, but only because I was a little out of shape and I had a thing of being underwater for more than 10 seconds, and being in closed and small spaces, but despise these qualms, would I do it again? In a heartbeat.

Mud Toggler And Drilling Software

This race is considered the toughest event on the planet, but all those challenges can be overcome with the appropriate training and in the end even if you don’t win the race, you fill fulfilled when you see all those hundreds of people working together to reach their goal. The drilling of a well is undoubtedly the most recognizable process of the oil and gas industry, but while the purpose of a drilling rig is quite simple, the process, itself, is anything but. Many problems can arise when the drilling process begins. Some of these problems are:

Pipe sticking
Hole deviation
Lost circulation
Pipe failures
Borehole instability
Mud contamination
Formation damage
Hole cleaning

These are just a few of the many other problems we can encounter while performing a drilling operation.

How can we deal with these challenges before they turn to major problems? Well, just like a person that enters the Tough Mudder has to train hard in advance to be prepared for the race, a drilling engineer must prepare himself beforehand so that when he faces the challenges he’ll be able to make a smart move to avoid having bigger problems.

BigCube of Pegasus Vertex

Pegasus Vertex, Inc. offers a variety of software that are the latest in technical advances and they are excellent tools for both onshore and offshore operations, in other words PVI can “train” any drilling engineer to be able to anticipate and therefore prevent any problem that can occur during the drilling process, so they can be prepared to make one of the toughest events on the planet (drilling operations) be a successful one.