Drilling Industry Glossary
tail cement
tension limit
tie-back liner
ton-mile
TOC
TOL
torque
torque and drag
total depth (TD)
total flow rate (TFA)
traveling block
trip in
trip out
true vertical depth (TVD)
tungsten carbide
Tail Cement
The last cement slurry pumped during a cementing job. The tail cement covers the lower sections of the well and shoe track, and is typically denser than the lead slurry that precedes it.
You may also be interested in: